House (Twin) for sale
BEAUTIFUL HOUSES, GREAT LOCATION, DABROWA FOREST
ul.Dąbrowa Leśna, Łomianki
1 499 000,00 PLN
9 265,00 PLN / m2

1
/
8
Key informations
Type of transaction:sale
Property type:House (Twin)
Market:original
Space:161,78 m2
Rooms:4
Bathrooms:3
Toilets:1
Floors:1
Rent:0.00
Parking space:Yes
Avaliable from:01.03.2022
Floor:1
Garden:Yes
Terrace:Yes
Offer number:WIL213368
Location

Description
NO PROSPENSION AND PCC TAX.
ŁOMIANKI DĄBROWA LEŚNA, EXCELLENT PRESTIGIOUS LOCATION.
CAMERAL INVESTMENT - CLOSED INDOORHOUSE OF 4 TWO-BED HOUSES
MODERN HOUSES IN THE TREES.
THE NEIGHBORHOODS OF KAMPINOWSKY POUCH, 17 KM FROM THE CENTRE OF WARSAW.
Houses with a modern body and a very functional layout of rooms were designed in accordance with current trends. Panoramic windows, the height of the premises of 2.9 m, a very functional layout of rooms, timeless design surrounded by beautiful trees guarantee the comfort of living and the possibility for residents to relax in their own garden.
Another asset of the investment is its excellent location in the green part of Dąbrowa. The neighbourhood of Kampinos National Park favours recreation, encouraging hiking and cycling trips.
The buildings made using high quality materials will satisfy the needs of even the most demanding customers. The closed and fenced estate consists of four two-family buildings.
In the house with a total area of 161 m2, net area of 125 m2 we have at our disposal:
In the living area on the ground floor: a hall, a spacious living room (28.5 m2) with access to the terrace and garden, an open kitchen (8.5 m2), a toilet and a single-car garage
On the first floor: three bedrooms (19.8, 12.8, 12.2 m2), the largest with its own bathroom and dressing room, a large bathroom (6.3 m2) accessible from the hall and a boiler room with a laundry room
Above the first floor, we have an additional attic space with skylight windows, for your own arrangement.
The property of approximately 350 m2 will be landscaped - access to the building and driveway paved with paving stones. The estate will be fenced with an internal access road to the premises and a remote control gate.
Planned date of completion - June 2023
All utilities (electricity, gas, water, sewerage, internet)
House in developer condition:
- Foundations - of concrete blocks
- External and internal walls - ceramic blocks
- Ceilings - over ground floor and ground floor - monolithic reinforced concrete based on bearing walls, beams and columns.
- Stairs - monolithic reinforced concrete.
- Roof - wooden structure, rafter-collar made of impregnated pine wood, covering with seam sheet - graphite colour.
- Insulation - insulation of foundation walls - polystyrene WODOSTYR SUPER EPS 100 - 10 cm with damp proofing, insulation of external walls - graphite polystyrene gr. 15 and 20 cm
insulation of roof slants - 20 cm polyurethane foam, protected with vapour-proof membrane, insulation of floor on the ground - hard foamed polystyrene EPS 100 - 10 cm, insulation of floor in garage EPS 200
- Fireplace - system chimney made of SCHIEDEL blocks,
- Ventilation and gas cooker chimneys - made of expanded clay blocks,
- Facade - thin-coat silicate and silicone plaster by Ceresit in white and graphite colours
- PVC triple glazed windows (48mm) with excellent insulation (0.78 W/m2K), (graphite colour)
- Entrance door made of steel, insulated with polyurethane foam, burglar-proof
- Wall and ceiling finishes - gypsum plaster
- Flooring - insulation, cement screeds made in Mixokret technology
- Sectional garage door without drive
- Wiring for electrical installation, alarm, telecommunication, intercom (without fittings)
- Plastic water and sewage system
- Central heating system with connection for radiators - plastic pipes (without cooker and radiators), underfloor heating on the ground floor and in bathrooms
- Entrance gate to the housing estate controlled by remote control, entrance gate with electromagnet, system fencing made of metal profiles on a foundation made of concrete elements
- Electricity, gas, sewage and water connections
THE ENVIRONMENT
The estate is located in the prestigious, green part of Łomianki municipality.
The city offers a full infrastructure - primary schools (modern SP2 school within a 10-minute walk), high school, kindergarten, swimming pool, sports hall, sports fields, riding centres. Nearby there is a shopping centre - Auchan, a modern service and commercial centre Prochownia.
COMMUNICATION
A bus stop within 100 m from the housing estate (line 250) leading to the Młociny metro station and the centre of the capital city. For motorists, within a few minutes we are on route No. 7, within half an hour (17 km) outside rush hours to the centre of Warsaw.
I invite you to the presentation,
to contact by e-mail or telephone
600 286 772
ŁOMIANKI DĄBROWA LEŚNA, EXCELLENT PRESTIGIOUS LOCATION.
CAMERAL INVESTMENT - CLOSED INDOORHOUSE OF 4 TWO-BED HOUSES
MODERN HOUSES IN THE TREES.
THE NEIGHBORHOODS OF KAMPINOWSKY POUCH, 17 KM FROM THE CENTRE OF WARSAW.
Houses with a modern body and a very functional layout of rooms were designed in accordance with current trends. Panoramic windows, the height of the premises of 2.9 m, a very functional layout of rooms, timeless design surrounded by beautiful trees guarantee the comfort of living and the possibility for residents to relax in their own garden.
Another asset of the investment is its excellent location in the green part of Dąbrowa. The neighbourhood of Kampinos National Park favours recreation, encouraging hiking and cycling trips.
The buildings made using high quality materials will satisfy the needs of even the most demanding customers. The closed and fenced estate consists of four two-family buildings.
In the house with a total area of 161 m2, net area of 125 m2 we have at our disposal:
In the living area on the ground floor: a hall, a spacious living room (28.5 m2) with access to the terrace and garden, an open kitchen (8.5 m2), a toilet and a single-car garage
On the first floor: three bedrooms (19.8, 12.8, 12.2 m2), the largest with its own bathroom and dressing room, a large bathroom (6.3 m2) accessible from the hall and a boiler room with a laundry room
Above the first floor, we have an additional attic space with skylight windows, for your own arrangement.
The property of approximately 350 m2 will be landscaped - access to the building and driveway paved with paving stones. The estate will be fenced with an internal access road to the premises and a remote control gate.
Planned date of completion - June 2023
All utilities (electricity, gas, water, sewerage, internet)
House in developer condition:
- Foundations - of concrete blocks
- External and internal walls - ceramic blocks
- Ceilings - over ground floor and ground floor - monolithic reinforced concrete based on bearing walls, beams and columns.
- Stairs - monolithic reinforced concrete.
- Roof - wooden structure, rafter-collar made of impregnated pine wood, covering with seam sheet - graphite colour.
- Insulation - insulation of foundation walls - polystyrene WODOSTYR SUPER EPS 100 - 10 cm with damp proofing, insulation of external walls - graphite polystyrene gr. 15 and 20 cm
insulation of roof slants - 20 cm polyurethane foam, protected with vapour-proof membrane, insulation of floor on the ground - hard foamed polystyrene EPS 100 - 10 cm, insulation of floor in garage EPS 200
- Fireplace - system chimney made of SCHIEDEL blocks,
- Ventilation and gas cooker chimneys - made of expanded clay blocks,
- Facade - thin-coat silicate and silicone plaster by Ceresit in white and graphite colours
- PVC triple glazed windows (48mm) with excellent insulation (0.78 W/m2K), (graphite colour)
- Entrance door made of steel, insulated with polyurethane foam, burglar-proof
- Wall and ceiling finishes - gypsum plaster
- Flooring - insulation, cement screeds made in Mixokret technology
- Sectional garage door without drive
- Wiring for electrical installation, alarm, telecommunication, intercom (without fittings)
- Plastic water and sewage system
- Central heating system with connection for radiators - plastic pipes (without cooker and radiators), underfloor heating on the ground floor and in bathrooms
- Entrance gate to the housing estate controlled by remote control, entrance gate with electromagnet, system fencing made of metal profiles on a foundation made of concrete elements
- Electricity, gas, sewage and water connections
THE ENVIRONMENT
The estate is located in the prestigious, green part of Łomianki municipality.
The city offers a full infrastructure - primary schools (modern SP2 school within a 10-minute walk), high school, kindergarten, swimming pool, sports hall, sports fields, riding centres. Nearby there is a shopping centre - Auchan, a modern service and commercial centre Prochownia.
COMMUNICATION
A bus stop within 100 m from the housing estate (line 250) leading to the Młociny metro station and the centre of the capital city. For motorists, within a few minutes we are on route No. 7, within half an hour (17 km) outside rush hours to the centre of Warsaw.
I invite you to the presentation,
to contact by e-mail or telephone
600 286 772
Offer number
Offer advisor
Grażyna Werder